Photo Gallery

Home » Photo Gallery » Modifications » Flooring and Subfloors
20160619_093718.jpg
20160619_093718.jpg
There was a lot of planing involved. A lot. Here my Pops is feeding a slat through the planer. We made a lot of sawdust in order to get the boards down to the same level as the high parts of the van floor.
20160619_125038.jpg
20160619_125038.jpg
20160619_125108.jpg
20160619_125108.jpg
Template skills. I am learning them.
20160619_125111.jpg
20160619_125111.jpg
20160619_125116.jpg
20160619_125116.jpg
20160619_125123.jpg
20160619_125123.jpg
20160619_125140.jpg
20160619_125140.jpg
About 32 man hours to get to this point.
20160625_094545.jpg
20160625_094545.jpg
Subfloor placed over the slats.
20160625_094552.jpg
20160625_094552.jpg
20160625_094601.jpg
20160625_094601.jpg
20160705_160658.jpg
20160705_160658.jpg
20160705_160933.jpg
20160705_160933.jpg
I placed heavy tools on top to press the boards flat while the glue dried.
20160707_160614.jpg
20160707_160614.jpg
20160707_160619.jpg
20160707_160619.jpg
Getting ready to stain the subfloors.
20160707_172520.jpg
20160707_172520.jpg
20160707_172557.jpg
20160707_172557.jpg
Stained with Thompson's Water Seal.
20160707_172600.jpg
20160707_172600.jpg
20160707_184326.jpg
20160707_184326.jpg
Rear view of the installed subfloor.
20160707_184337.jpg
20160707_184337.jpg
Subfloor in place.
20160707_191855.jpg
20160707_191855.jpg
Laid down some carpet to have a nice work surface for the next step in the overall construction.
thumbnail_20170114_114324.jpg
thumbnail_20170114_114324.jpg